Our company produce vertical turbine pump,vertical long axis pump, vertical type condensate pump ,vertical wet pit pump,right Angle gear box
Manufacturer of vertical turbine pumpFocus on vertical wet pit pump, right Angle gear box
HOTLINE:+8618507312158+8613974960765
Contact us
Vertical turbine pump manufacturers
HOTLINE::+8613974960765
Mobile:+8618507312158
Email:sale@ljpump.net
Address :China's hunan province changsha furong road long xiang industrial park
Your position: HOME >> Knowledge >> vertical turbine pump
vertical turbine pump

Two vertical drum bag condensate turbine pumps (vertical drum bag condensate pumps) for Unit 2 of the Gongyi project have been lifted and positioned

DATE:2025/4/30 0:15:48 Source:Vertical Turbine Pump Manufacturer's HUNAN PERFECT industry in china Visits:

Two vertical drum bag condensate turbine pumps (vertical drum bag condensate pumps) for Unit 2 of the Gongyi project have been lifted and positioned


 

Two vertical drum bag condensate turbine pumps (vertical drum bag condensate pumps) for Unit 2 of the Gongyi project have been lifted and positioned


 
On June 19th, the two vertical drum bag condensate turbine pumps (vertical drum bag condensate pumps) of Unit 2 of the Gongyi project were successfully lifted into place.
The LTDN condensate water pump is a vertical, drum bag structure with a pump body size (length, diameter) of 9.55 × Φ 1.8m, a net weight of about 15t, a 6-stage impeller type, a rated speed of 1480r/min, and a flow rate of 1495t/h. It is one of the important auxiliary mechanical equipment in the operation of the power plant. Two pumps are arranged in parallel in the wet pump pit near the -3.6m condenser hot well.
Based on the relatively narrow working conditions of the construction site, the project department's steam turbine pipeline professional work area has formulated detailed technical plans and safety measures. Prior to lifting, personnel were organized to conduct detailed technical and safety briefings, and the two condensate water pumps were successfully lifted into place using a combination of crane hooks in the steam turbine room, creating conditions for the installation of auxiliary pipelines in the next step.

 

 

 

 

Online Service
Contact

TEL

+8618507312158

+8613974960765

WeChat
Online
Service